Getting the slab right before anything goes down
Most resin floor failures aren't the resin. They're bond failures — a coating laid over laitance, contamination, moisture or an old system that was never properly removed. We see it often enough across Sydney warehouses and inner-west industrial units, where a previous coating was gone over rather than taken off.
We come out of concrete preparation, so the slab work isn't subcontracted or rushed to get to the interesting part. The floor gets shot blasted or ground to the profile the system's data sheet specifies, moisture is checked before anything is mixed, and any existing coating comes off properly first.
It's the least visible part of the job and the part that decides whether you're recoating in eighteen months. On older Sydney slabs — plenty of them poured before vapour barriers were standard, and plenty more sitting below ground in basement plant rooms — moisture testing matters more than the brochure suggests.